Ground Water discharge permit (Smithfield)

Division of Water Quality
Utah Department of Environmental Quality
Public Notice of Issuance of Ground Water Discharge Permit
Permit No. UGW010016

Purpose of Public Notice
The Utah Department of Environmental Quality (DEQ) is soliciting comments on the request to issue a ground water discharge permit as described below. The ground water discharge permit is issued by the Director of the Division of Water Quality under authority of the Utah Water Quality Act, Section 19-5-106(g) Utah Code Ann. 1953, as amended and Utah Administrative Code R317-6. Under Section 19-1-301.5, effective May 8, 2012, a person who wishes to challenge a Permit Order may only raise an issue or argument during an adjudicatory proceeding that was raised during the public comment period and was supported with sufficient information or documentation to enable the Director to fully consider the substance and significance of the issue. Utah Code Ann. 19-1-301.5 can be viewed at the following internet URL:
https://le.utah.gov/xcode/Title19/Chapter1/19-1-S301.5.html.

Permit Information
Permittee Name: Smithfield Hog Production

Facility Location: Beaver and Millard Counties

Mailing Address: P.O. Box 100
Milford, UT 84751

Groundwater Discharge Permit No.UGW010016 is being issued for the construction and operation of swine production facilities owned by Smithfield Hog Production. The 52 farm sites are located in Beaver and Millard Counties, approximately 10 miles north of Milford, UT. Manure from the hog production facilities is washed into anaerobic basins for treatment and storage. The lagoon systems at farm sites consist of one primary storage basin and one containment basin for evaporation, or an anaerobic digester. In addition to well monitoring the basins are lined with a flexible membrane liner for the protection of ground water. The ground water quality beneath farm sites ranges from Class 1A Pristine Ground Water to Class III Drinking Water Quality.

Public Comments
Public comments are invited any time prior to Friday, May 19, 2017. Written comments may be directed to the Division of Water Quality, P.O. Box 144870, Salt Lake City, UT 84114-4870. All comments received prior to close of business Friday, May 19, 2017, will be considered in the formulation of final determinations to be imposed on the permit. A public hearing may be held if written requests are received within the first 15 days of this public comment period that demonstrate significant public interest and substantive issues exist to warrant holding a hearing.

Further Information
Additional information may be obtained upon request by contacting Ed Hickey at (801) 536-4300 or ehickey@utah.gov by writing to the aforementioned address. Related documents are available for review during normal business hours at DWQ, 195 North 1950 West in Salt Lake City or on the DWQ web page at http://www.deq.utah.gov/NewsNotices/notices/water/index.htm.

In compliance with the Americans with Disabilities Act, individuals with special needs (including auxiliary communicative aids and services) should contact Larene Wyss, Office of Human Resources at (801) 536-4284, TDD (801) 536-4284.


Newspaper Administration